1.) New shackle boxes...done.
2.) Bumper/hitch tie-ins to frame....done.
3.) Passenger rear fender trimmed.
4.) 6* pinion angle shim and new spring centering pins installed. U-bolts finger tight around axle.
5.) Shock mounts welded on, and shocks connected.
Tomorrow I have to:
1.) Mount my hydro reservoir, and possibly bleed the system.
2.) Hook up the brake lines, and maybe bleed them.
3.) Make rear drive shaft.
4.) Trim driver's fender.
5.) Trim front bumper and fenders.
6.) Mount spare tire.
Will it be ready??? HHHHMMMMMM
