I understand what you were saying, and this project has had my ass in gear for a long time so it may seem like I have had a lot of unfinished projects, but this one particular one has been kicking my arse fortoo long and I do plan on getting it going on a much faster pace than when I had the fiberglass Tub.
I have a sheet of 18 guage that I plan to use as structual flooring and bracing in orer to mount the body on the TJ frame which by the way I measured up and it looks like it will take a little squeezing but will fit almost perfectly.
as soon as this wretched heat blows over I'm going to pul the original frame out from under it and re-evaluate the mounting points. I plan to make a 1/2exo cage to prootect the general shape and integrity of the body, which may just end up being the way I connect it to the frame we'll see though.